Sound Acoustic Solutions
 

Installation Instructions - Perforated Base Insulation Hangers 

The 2" x 2" base is fabricated out of metal with the pin attached for impaling and installing various thermal and acoustical insulation material. 

Installation:

  1. Anchor must be applied to a clean, dry, non-painted surface
  2. Apply adhesive to the base of the hanger. Spread 1/16 film hanger adhesive to base.
  3. Stick anchor into position with a twisting motion to assure an even spread of adhesive. The adhesive should protrude through the perforations and beyond the edges of the base. 
  4. Hand insulation to dry. ALLOW ADHESIVE TO DRY THOROUGHLY before hanging insulation, usually 24-48 hours.
  5. Secure with self-locking washer and then bend over or clip of the spindle.  
Customer Service
Contact Us
Join our Mailing List
Sign Up
Installation Instructions
Office: 877-399-9697   |   Fax: 440-349-6786   |   11 Industry Drive   |   Bedford, OH 44146   |   Shipping   |   Privacy   |   Careers   |   Admin Login All Rights Reserved 2018, Sound Acoustic Solutions - Admin Login